Kurmenty Small Hydropower Plant
Construction of the Kurmenty Small Hydropower Plant with pressure derivation in Tyup District, Issyk-Kul Region.

Open for investment
1 / 2
Illustration from the passport
Project description
Construction of the Kurmenty Small Hydropower Plant with pressure derivation in Tyup District, Issyk-Kul Region.
Key parameters
- Design capacity
- 2.3 MW
- Estimated output
- 11.9 million kWh per year
- Head
- 281 m
- Design flow
- 1.05 m³/s
- Planned placement area
- 16.6 ha
- Connection
- A 6 or 10 kV line to the Kurmenty substation is proposed, about 2.7 km
Project location
Kurmenty River, Tyup District, Issyk-Kul Region.
Approximate location. Exact site and participation conditions — upon request to the National Investment Agency.
Participation in the project
National Investment Agency
Contact the agency to receive a presentation, discuss participation terms, and next steps. The selected project will be automatically indicated in your inquiry.