Small hydropower plant on the Chon-Kemin River
Construction of a small hydropower plant on the Chon-Kemin River with non-pressure diversion and power delivery via a new transmission line.

Open for investment
1 / 3
Illustration from the passport
Project description
Construction of a small hydropower plant on the Chon-Kemin River with non-pressure diversion and power delivery via a new transmission line.
Financial indicators
- Total cost
- 6,732,460 USD
- Funding required
- 6,732,460 USD
Participation
Financing is being considered under the BOOT model — construction, ownership, operation, and subsequent transfer of the facility.
Key parameters
- Installed capacity
- 7.1 MW
- Estimated output
- 49.8 million kWh per year; net supply 49.3 million kWh
- Diversion and head
- 1.85 km; head 50 m; estimated water flow 18 m³/s
- Land plots
- Preliminary allocation — 14 ha
- Grid connection
- Provision for 35 kV overhead line with a length of 13 km and a step-up substation
Project location
Planned HPP building on the Chon-Kemin River, Kemin District, Chuy Region.
Location of the facility on the map.
Funding required
6,732,460 USD
RegionChuy region
Participation in the project
National Investment Agency