Small hydropower plant on the Chon-Kemin River

Construction of a small hydropower plant on the Chon-Kemin River with non-pressure diversion and power delivery via a new transmission line.
Small hydropower plant on the Chon-Kemin River
Open for investment
1 / 3

Illustration from the passport

Project description

Construction of a small hydropower plant on the Chon-Kemin River with non-pressure diversion and power delivery via a new transmission line.

Financial indicators

Total cost
6,732,460 USD
Funding required
6,732,460 USD

Participation

Financing is being considered under the BOOT model — construction, ownership, operation, and subsequent transfer of the facility.

Key parameters

Installed capacity
7.1 MW
Estimated output
49.8 million kWh per year; net supply 49.3 million kWh
Diversion and head
1.85 km; head 50 m; estimated water flow 18 m³/s
Land plots
Preliminary allocation — 14 ha
Grid connection
Provision for 35 kV overhead line with a length of 13 km and a step-up substation

Project location

Planned HPP building on the Chon-Kemin River, Kemin District, Chuy Region.

Location of the facility on the map.

Funding required
6,732,460 USD
RegionChuy region

Participation in the project

National Investment Agency

Contact the agency to receive a presentation, discuss participation terms, and next steps. The selected project will be automatically indicated in your inquiry.

Interested in this project?

Contact us for details and to discuss participation in the project.

All projects