Skip to main content

Electrification of the Lugovaya — Balykchy railway

Electrification of the Lugovaya — Balykchy railway section with transition to electric traction.
Electrification of the Lugovaya — Balykchy railway
Open for investment
1 / 1

Illustration from the passport

Project description

Electrification of the Lugovaya — Balykchy railway section with transition to electric traction. The project provides for power supply to the line and works on maintenance depots in Bishkek and Balykchy.

Financial indicators

Total cost
297,670,000 USD
Funding required
297,670,000 USD

Key parameters

Section length
321.5 km; of which 261.2 km in Kyrgyzstan and 60.3 km in Kazakhstan
Track
Single track, gauge width 1 520 mm
Stations and passing loops
18 stations and 3 passing loops
Electrification
274.52 million USD
Power transmission lines
15.7 million USD
Maintenance depots
5.15 million USD
Other expenses
2.3 million USD

Project location

Lugovaya — Bishkek — Tokmok — Balykchy railway corridor; Chuy and Issyk-Kul regions, section in Kazakhstan.

Approximate location. Exact site and participation conditions — upon request to the National Investment Agency.

Funding required
297,670,000 USD
RegionInfrastructure

Participation in the project

National Investment Agency

Contact the agency to receive a presentation, discuss participation terms, and next steps. The selected project will be automatically indicated in your inquiry.

Interested in this project?

Contact us for details and to discuss participation in the project.

All projects